Back to Results
First PageMeta Content
Waste / Earth / Civil engineering / Soil mechanics / Ash pond / Ponds / Geotechnical engineering / Fly ash / Slope stability / Geology / Environment / Coal


Report of Phase 2 Geotechnical Exploration
Add to Reading List

Document Date: 2010-10-20 10:16:23


Open Document

File Size: 4,27 MB

Share Result on Facebook

Company

Alabama Stantec Consulting Services Inc. / /

Event

Natural Disaster / /

Facility

Ash Pond Complex / Pump Pond dam / Main Ash Pond A dam / Lower Stilling Pond dam / Structures Within Ash Pond Complex / Dike Raise / Laboratory Testing / Laboratory Testing Appendix G Results / Dike Raising Typical Section / Tennessee Valley Authority’s Widows Creek Fossil Plant / /

/

IndustryTerm

storm water control systems / /

Organization

United States Army / Tennessee Valley Authority / /

Person

Shelby Tube / Pond Underdrain / Permeability Testing / Permeability Test / /

/

Position

design engineer / representative / Executive / Head / /

URL

www.stantec.com / /

SocialTag