<--- Back to Details
First PageDocument Content
Boating / Hull / Naval architecture / Structural engineering / Structural system / Waterline / Deck / Freeboard / Tonnage / Watercraft / Water / Ship construction
Date: 2014-03-03 19:56:01
Boating
Hull
Naval architecture
Structural engineering
Structural system
Waterline
Deck
Freeboard
Tonnage
Watercraft
Water
Ship construction

Builder’s certificate DEFINITIONS Overall length Overall length is obtained by measuring (to two decimal places) the distance between a vertical line passing through a point being the foremost part of the stem, and a v

Add to Reading List

Source URL: amsa.gov.au

Download Document from Source Website

File Size: 183,76 KB

Share Document on Facebook

Similar Documents

Recommendation for South Bethany Maximum House Elevations BFE Committee June 10, 2016  Background

Recommendation for South Bethany Maximum House Elevations BFE Committee June 10, 2016 Background

DocID: 1qG5l - View Document

TOWN OF SOUTH BETHANY SLR & SS Committee Meeting Minutes Friday, August 14, 2015, at 10:00 AM 1. Call meeting to order

TOWN OF SOUTH BETHANY SLR & SS Committee Meeting Minutes Friday, August 14, 2015, at 10:00 AM 1. Call meeting to order

DocID: 1pOjM - View Document

Page 1 of 8  TOWN OF SOUTH BETHANY TOWN COUNCIL WORKSHOP MEETING MINUTES NOVEMBER 20, 2014 MEETING CALLED TO ORDER

Page 1 of 8 TOWN OF SOUTH BETHANY TOWN COUNCIL WORKSHOP MEETING MINUTES NOVEMBER 20, 2014 MEETING CALLED TO ORDER

DocID: 1ps6l - View Document

TOWN OF SOUTH BETHANY Minutes for SLR & SS Committee Meeting Friday, May 9, 2014 at 1:00 Location: South Bethany Town Hall Agenda Items Covered 1. Meeting called to order by George Junkin at 1:00. Members present were; G

TOWN OF SOUTH BETHANY Minutes for SLR & SS Committee Meeting Friday, May 9, 2014 at 1:00 Location: South Bethany Town Hall Agenda Items Covered 1. Meeting called to order by George Junkin at 1:00. Members present were; G

DocID: 1oKGh - View Document

GOLDEN GATE SAUSALITO FERRY TERMINAL BOARDING FLOAT SIZE DISCUSSION Passenger movement from the gangway onto the float includes a fixed level landing at the end of the gangway, an adjustable height boarding platform that

GOLDEN GATE SAUSALITO FERRY TERMINAL BOARDING FLOAT SIZE DISCUSSION Passenger movement from the gangway onto the float includes a fixed level landing at the end of the gangway, an adjustable height boarding platform that

DocID: 1osOz - View Document