<--- Back to Details
First PageDocument Content
Technology / Coiled tubing / Wellhead / Well intervention / Completion / Christmas tree / Snubbing / Wireline / Workover / Oil wells / Petroleum production / Petroleum
Date: 2009-04-27 06:44:49
Technology
Coiled tubing
Wellhead
Well intervention
Completion
Christmas tree
Snubbing
Wireline
Workover
Oil wells
Petroleum production
Petroleum

NORSOK STANDARD D-010 Rev. 3, AugustWell integrity in drilling and well operations

Add to Reading List

Source URL: www.npd.no

Download Document from Source Website

File Size: 3,02 MB

Share Document on Facebook

Similar Documents

Injection Well Design and Protective Mechanisms Wellhead P Injection Pressure CO2 Inflow Annulus Pressure P

Injection Well Design and Protective Mechanisms Wellhead P Injection Pressure CO2 Inflow Annulus Pressure P

DocID: 1u4N0 - View Document

Simpson Core #26 drilled in the middle of an oil seep. Depth of the oily-water prohibits access to the wellhead. Light trash is present in the seep between Cores #30 and #30A.

Simpson Core #26 drilled in the middle of an oil seep. Depth of the oily-water prohibits access to the wellhead. Light trash is present in the seep between Cores #30 and #30A.

DocID: 1tTG0 - View Document

GE Oil & Gas  Subsea Wellhead Solutions Advanced technologies with industry-proven reliability,

GE Oil & Gas Subsea Wellhead Solutions Advanced technologies with industry-proven reliability,

DocID: 1ssDU - View Document

GE Oil & Gas  SFX Wellhead System A standardized solution for simple operation and ultra-reliability in the most demanding fatigue applications

GE Oil & Gas SFX Wellhead System A standardized solution for simple operation and ultra-reliability in the most demanding fatigue applications

DocID: 1saJk - View Document

State Approved Wellhead Protection County 2 County 3  PWS name

State Approved Wellhead Protection County 2 County 3 PWS name

DocID: 1s0ey - View Document