Date: 2012-09-26 10:54:44Electrical grid North American Electric Reliability Corporation Florida Reliability Coordinating Council SERC Reliability Corporation ReliabilityFirst Northeast Power Coordinating Council Western Electricity Coordinating Council Electric Reliability Council of Texas Western Interconnection Eastern Interconnection Economy of North America Electric power | | Table 8.12b Electric Noncoincident Peak Load and Capacity Margin: Winter Peak Period, [removed]Megawatts, Except as Noted) Noncoincident Peak Load 1 by North American Electric Reliability Corporation (NERC) 2 Regional Add to Reading ListSource URL: www.eia.govDownload Document from Source Website File Size: 16,59 KBShare Document on Facebook
|