<--- Back to Details
First PageDocument Content
Petroleum production / Drilling rig / Oilfield terminology / Petroleum engineering / Mineral exploration / Ultramafic rock / Oil well / Drill / Technology / Economic geology / Geophysics
Date: 2014-01-20 19:21:24
Petroleum production
Drilling rig
Oilfield terminology
Petroleum engineering
Mineral exploration
Ultramafic rock
Oil well
Drill
Technology
Economic geology
Geophysics

Mount Gibson Iron Limited ABNLevel 1, 2 Kings Park Road West Perth 6005, Western Australia PO Box 55, West Perth WA 6872 Telephone:

Add to Reading List

Source URL: www.mtgibsoniron.com.au

Download Document from Source Website

File Size: 1,34 MB

Share Document on Facebook

Similar Documents

ASSOCIATE OF APPLIED SCIENCE (AAS) PETROLEUM PRODUCTION TECHNOLOGY LAST NAME DATE  FIRST NAME

ASSOCIATE OF APPLIED SCIENCE (AAS) PETROLEUM PRODUCTION TECHNOLOGY LAST NAME DATE FIRST NAME

DocID: 1vbOj - View Document

2016 International Petroleum Environmental Conference Environmental Issues and Solutions in Exploration, Production, Refining & Distribution of Petroleum

2016 International Petroleum Environmental Conference Environmental Issues and Solutions in Exploration, Production, Refining & Distribution of Petroleum

DocID: 1tdGe - View Document

The Status of U.S. Oil and Gas Production (SpringBy Roger Blanchard I find it interesting that many of the individuals expressing the greatest concerns about oil and natural gas supplies are petroleum geologists.

The Status of U.S. Oil and Gas Production (SpringBy Roger Blanchard I find it interesting that many of the individuals expressing the greatest concerns about oil and natural gas supplies are petroleum geologists.

DocID: 1s1gQ - View Document

Oryx Petroleum Second Quarter 2016 Financial and Operational Results Average production of 3,100 bbl/d during the quarter with positive netback and reduced expenditures; First phase development of Zey Gawra has commenced

Oryx Petroleum Second Quarter 2016 Financial and Operational Results Average production of 3,100 bbl/d during the quarter with positive netback and reduced expenditures; First phase development of Zey Gawra has commenced

DocID: 1rWbc - View Document

BP Statistical Review of World EnergyAugust 2014

BP Statistical Review of World EnergyAugust 2014

DocID: 1ru6D - View Document