Back to Results
First PageMeta Content
Oil wells / Geotechnical engineering / Technology / Engineering / Pump / Water well / Wellhead / Casing / Completion / Submersible pump / Aquifer test


Attachment #3 TECHNICAL SPECIFICATIONS FOR THE CONSTRUCTION, TESTING AND INSTALLATION OF A 12” IRRIGATION PRODUCTION WELL AND PUMP The work consists of the drilling and testing of an irrigation test well for L.E. Kaufm
Add to Reading List

Document Date: 2009-04-15 04:52:29


Open Document

File Size: 74,67 KB

Share Result on Facebook
UPDATE