Back to Results
First PageMeta Content
Biomass / Bioenergy / Heating /  ventilating /  and air conditioning / Plumbing / Energy conservation / Biomass heating system / Boiler / Renewable heat / Wood pellet / Sustainability / Energy / Environment


Case Study Biomass Boiler Installation at Lochaber Leisure Centre, Fort William Project Highlights
Add to Reading List

Document Date: 2013-09-04 05:40:54


Open Document

File Size: 1,63 MB

Share Result on Facebook

Company

Campbell Palmer Partnership Ltd / /

Currency

pence / GBP / /

Event

Environmental Issue / /

Facility

Lochaber Leisure Centre / Fort William / University of Strathclyde / /

IndustryTerm

elevated steel platforms / annual energy / prefabricated steel wood pellet tank / biomass boiler systems / biomass system / oil boiler / internal solution / energy saving / oil boilers / annual heat energy demand / possible solutions / oil / expansion equipment / oil boiler firing / maximum possible annual energy / annual energy cost saving / fuel oil / renewable energy policy / energy / /

NaturalFeature

Highland Council Biomass / /

Organization

Energy Systems Research Unit / Lochaber Leisure Centre / University of Strathclyde / Highland Council / /

Position

Eddie Boyd Principal Engineer / /

URL

www.carbontrust.co.uk/biomass-support / /

SocialTag