<--- Back to Details
First PageDocument Content
Otis Elevator Company / Eiffel Tower / Counterweight / Hoist / Escalator / Elisha Otis / Guide rail / Pulley / Minato Ward 2006 elevator accident / Transport / Technology / Elevator
Date: 2005-09-28 07:31:28
Otis Elevator Company
Eiffel Tower
Counterweight
Hoist
Escalator
Elisha Otis
Guide rail
Pulley
Minato Ward 2006 elevator accident
Transport
Technology
Elevator

About Elevators Moving the world Imagine the skyline of a modern city if the elevator did not exist. Buildings would be limited to five or six stories. Most of the architecture of the 20th and 21st century

Add to Reading List

Source URL: www.otisworldwide.com

Download Document from Source Website

File Size: 1,45 MB

Share Document on Facebook

Similar Documents

Aluminum Index  A10 Super Hoist / PSL-Load Handler / PSL Advantage

Aluminum Index A10 Super Hoist / PSL-Load Handler / PSL Advantage

DocID: 1uKbb - View Document

A Generic Model and Hybrid Algorithm for Hoist Scheduling Problems Robert Rodosek and Mark Wallace IC-Parc, Imperial College, SW7-2AZ London E-mail: frr5,

A Generic Model and Hybrid Algorithm for Hoist Scheduling Problems Robert Rodosek and Mark Wallace IC-Parc, Imperial College, SW7-2AZ London E-mail: frr5,

DocID: 1uGcI - View Document

   Stuctural class: minimum FEM A4: 起重机机械的整体组别 A4, Hoist mechanism: minimum FEM M5/2m:

   Stuctural class: minimum FEM A4: 起重机机械的整体组别 A4, Hoist mechanism: minimum FEM M5/2m:

DocID: 1tf4v - View Document

Mainsail Measurement Sheet www.Mariner-Sailmakers.com 1) P= ____ft ____in Finish Luff Measurement: Attach a tape measure to the main halyard and hoist it to the bottom edge of

Mainsail Measurement Sheet www.Mariner-Sailmakers.com 1) P= ____ft ____in Finish Luff Measurement: Attach a tape measure to the main halyard and hoist it to the bottom edge of

DocID: 1sfmK - View Document

Hanging Bed Hoist Pulley “A1”  safety ropes

Hanging Bed Hoist Pulley “A1” safety ropes

DocID: 1rtqC - View Document