Alazani

Results: 17



#Item
1Day trip to Winery of Georgia

Day trip to Winery of Georgia

Add to Reading List

Source URL: euralex2016.tsu.ge

Language: English - Date: 2016-03-04 06:48:48
2ANNEX 9. RENEWABLE ENERGY RESOURCES  Table 1. Theoretical Technical Hydropower Potential of the Rivers of the Alazani Basin River  Installed capacity: MW

ANNEX 9. RENEWABLE ENERGY RESOURCES Table 1. Theoretical Technical Hydropower Potential of the Rivers of the Alazani Basin River Installed capacity: MW

Add to Reading List

Source URL: www.globalwaters.net

Language: English - Date: 2013-01-02 06:18:13
    3ANNEX 6. HYDROLOGY, HYDROGEOLOGY  Figure 1. Hydrological Map of the Alazani River Basin Figure 2. Hydrological Map of the Iori Basin

    ANNEX 6. HYDROLOGY, HYDROGEOLOGY Figure 1. Hydrological Map of the Alazani River Basin Figure 2. Hydrological Map of the Iori Basin

    Add to Reading List

    Source URL: www.globalwaters.net

    Language: English - Date: 2013-01-02 06:15:32
      4ANNEX 7. BIOLOGICAL RESOURCES  Figure 1. Map of Land Cover of Georgia Figure 2. Vegetation Map of Upper Alazani Pilot Watershed Area

      ANNEX 7. BIOLOGICAL RESOURCES Figure 1. Map of Land Cover of Georgia Figure 2. Vegetation Map of Upper Alazani Pilot Watershed Area

      Add to Reading List

      Source URL: www.globalwaters.net

      - Date: 2013-01-02 06:16:25
        5ANNEX 5. HYDROLOGY  Figure 1. Hydrological Map of the Alazani River Basin Figure 2. Hydrological Map of the Iori Basin

        ANNEX 5. HYDROLOGY Figure 1. Hydrological Map of the Alazani River Basin Figure 2. Hydrological Map of the Iori Basin

        Add to Reading List

        Source URL: www.globalwaters.net

        Language: English - Date: 2012-12-12 15:13:41
          6ANNEX 10. GOVERNANCE RELATED INFORMATION  Figure 1. Municipalities and Territorial Units of the Alazani River Basin Figure 2. Municipalities and Territorial Units of the Iori River Basin

          ANNEX 10. GOVERNANCE RELATED INFORMATION Figure 1. Municipalities and Territorial Units of the Alazani River Basin Figure 2. Municipalities and Territorial Units of the Iori River Basin

          Add to Reading List

          Source URL: www.globalwaters.net

          - Date: 2013-01-02 06:18:48
            7Integrated Natural Resources Management in Watersheds (INRMW) of Georgia Program Technical Report 2. Rapid Assessment of the Rioni and Alazani-Iori River Basins of Georgia June, 2011

            Integrated Natural Resources Management in Watersheds (INRMW) of Georgia Program Technical Report 2. Rapid Assessment of the Rioni and Alazani-Iori River Basins of Georgia June, 2011

            Add to Reading List

            Source URL: www.globalwaters.net

            Language: English - Date: 2012-12-12 15:08:52
              8ANNEX 1. PHYSICAL-GEOGRAPHICAL FEATURES OF ALAZANI, IORI AND RIONI RIVER BASINS  Figure 1. Satellite Imagery of Georgia Figure 2. Topography of Georgia

              ANNEX 1. PHYSICAL-GEOGRAPHICAL FEATURES OF ALAZANI, IORI AND RIONI RIVER BASINS Figure 1. Satellite Imagery of Georgia Figure 2. Topography of Georgia

              Add to Reading List

              Source URL: www.globalwaters.net

              - Date: 2012-12-12 15:09:55
                9ANNEX 10. MUNICIPAL SERVICE INFRASTRUCTURE  Table 1. Drinking Water related Statistics for Selected Cities of Alazani and Rioni River BasinCity/town  Total population

                ANNEX 10. MUNICIPAL SERVICE INFRASTRUCTURE Table 1. Drinking Water related Statistics for Selected Cities of Alazani and Rioni River BasinCity/town Total population

                Add to Reading List

                Source URL: www.globalwaters.net

                Language: English - Date: 2012-12-12 15:33:06
                  10Annex 3. PEA Stakeholder Consultations 1. PEA stakeholder consultation, Upper and Lower Alazani-Iori Pilot Watershed Areas Date: 4 May 2012 Venue: Hotel Old Telavi, Telavi Consultations are to be organized by GLOWS conso

                  Annex 3. PEA Stakeholder Consultations 1. PEA stakeholder consultation, Upper and Lower Alazani-Iori Pilot Watershed Areas Date: 4 May 2012 Venue: Hotel Old Telavi, Telavi Consultations are to be organized by GLOWS conso

                  Add to Reading List

                  Source URL: www.globalwaters.net

                  Language: English - Date: 2013-01-02 06:11:57