Borrow pit

Results: 46



#Item
1This is the author’s version of a work that was submitted/accepted for publication in the following source: Burdett, R., Kozan, E., & Kenley, RBlock models for improved earthwork allocation planning in linear

This is the author’s version of a work that was submitted/accepted for publication in the following source: Burdett, R., Kozan, E., & Kenley, RBlock models for improved earthwork allocation planning in linear

Add to Reading List

Source URL: eprints.qut.edu.au

Language: English - Date: 2015-12-14 02:04:02
2Back to Contents  APPENDIX 3 BORROW PIT ALLOCATIONS (MLP PROPOSAL 6) A3.1 The following describes the proposed borrow pit sites referred to in MLP Proposal 6:Hammerwich Borrow Pit (Inset Map 18)

Back to Contents APPENDIX 3 BORROW PIT ALLOCATIONS (MLP PROPOSAL 6) A3.1 The following describes the proposed borrow pit sites referred to in MLP Proposal 6:Hammerwich Borrow Pit (Inset Map 18)

Add to Reading List

Source URL: www.staffordshire.gov.uk

Language: English - Date: 2014-12-17 04:25:14
3The Borrow Pits, Kelso Hole in the ground to wildlife wonderland What is a Borrow Pit? When the Ross River Dam was built in the 1970s, soil was taken from this 33ha site for the dam wall. The big holes left behind are no

The Borrow Pits, Kelso Hole in the ground to wildlife wonderland What is a Borrow Pit? When the Ross River Dam was built in the 1970s, soil was taken from this 33ha site for the dam wall. The big holes left behind are no

Add to Reading List

Source URL: www.creektocoral.org

Language: English - Date: 2012-03-30 04:41:21
4G-REP-003_tx Exec Summ.doc

G-REP-003_tx Exec Summ.doc

Add to Reading List

Source URL: www.ntepa.nt.gov.au

Language: English - Date: 2013-01-09 22:19:25
5GEOTECHNICAL INVESTIGATION REPORT  FOR THE HLATIKULU DAM FAILURE INCLUDING

GEOTECHNICAL INVESTIGATION REPORT FOR THE HLATIKULU DAM FAILURE INCLUDING

Add to Reading List

Source URL: www.swsc.co.sz

Language: English - Date: 2015-03-17 08:38:47
6Review of current Goal Attainment Scaling (GAS) criteria for borrow pit construction, use and rehabilitation within the Cooper Basin Report 06 March2014  Cooper Basin Borrow Pit GAS Criteria Review Project

Review of current Goal Attainment Scaling (GAS) criteria for borrow pit construction, use and rehabilitation within the Cooper Basin Report 06 March2014 Cooper Basin Borrow Pit GAS Criteria Review Project

Add to Reading List

Source URL: petroleum.statedevelopment.sa.gov.au

Language: English - Date: 2014-11-10 18:16:06
7Review of current Goal Attainment Scaling (GAS) criteria for borrow pit construction, use and rehabilitation within the Cooper Basin Report 06 March2014  Cooper Basin Borrow Pit GAS Criteria Review Project

Review of current Goal Attainment Scaling (GAS) criteria for borrow pit construction, use and rehabilitation within the Cooper Basin Report 06 March2014 Cooper Basin Borrow Pit GAS Criteria Review Project

Add to Reading List

Source URL: www.petroleum.dmitre.sa.gov.au

Language: English - Date: 2014-11-10 18:16:06
8Borrow pit / Landfill / Environment / Sustainability / Industrial ecology / Waste minimisation / Belconnen

RTF Document

Add to Reading List

Source URL: www.legislation.act.gov.au

Language: English - Date: 2011-07-25 21:04:32
9Borrow pit / Asbestos / Hazardous waste / Waste legislation / Pollution / Environment / Waste

RTF Document

Add to Reading List

Source URL: www.legislation.act.gov.au

Language: English - Date: 2010-07-01 01:59:09
10Australian Capital Territory  Waste Minimisation (West Belconnen Borrow Pit Remediation Fees) Determination[removed]No 1) Disallowable Instrument DI2009—207

Australian Capital Territory Waste Minimisation (West Belconnen Borrow Pit Remediation Fees) Determination[removed]No 1) Disallowable Instrument DI2009—207

Add to Reading List

Source URL: www.legislation.act.gov.au

Language: English - Date: 2010-07-01 01:59:08