East–West Interconnector

Results: 55



#Item
1Grid25 Newsletter Issue No. 12 July 2013 Grid25 Economic Benefits Study Launched A new study on the economic benefits of the Grid25 programme was launched in Dublin by the Minister

Grid25 Newsletter Issue No. 12 July 2013 Grid25 Economic Benefits Study Launched A new study on the economic benefits of the Grid25 programme was launched in Dublin by the Minister

Add to Reading List

Source URL: www.eirgridprojects.com

Language: English - Date: 2013-10-25 06:00:34
2EIRGRID EAST WEST INTERCONNECTOR UP AND RUNNING: The commercial operation of the East West Interconnector was temporarily deferred in October 2012 following reports of possible telephone noise interference in

EIRGRID EAST WEST INTERCONNECTOR UP AND RUNNING: The commercial operation of the East West Interconnector was temporarily deferred in October 2012 following reports of possible telephone noise interference in

Add to Reading List

Source URL: www.eirgridprojects.com

- Date: 2013-10-25 06:00:30
    3East West Interconnector – Allocated Import (GB – IE) Capacity 500 Viridian Energy Supply Limited (Energia) Vayu Limited SSE Energy Supply Limited

    East West Interconnector – Allocated Import (GB – IE) Capacity 500 Viridian Energy Supply Limited (Energia) Vayu Limited SSE Energy Supply Limited

    Add to Reading List

    Source URL: www.eirgrid.com

    Language: English - Date: 2015-04-21 10:15:32
      4Consultation Paper EIRGRID EAST WEST INTERCONNECTOR Charging Methodology Issue 1.0 Date:

      Consultation Paper EIRGRID EAST WEST INTERCONNECTOR Charging Methodology Issue 1.0 Date:

      Add to Reading List

      Source URL: www.eirgrid.com

      Language: English - Date: 2013-10-25 07:18:40
        5Valuation of Interconnector Transmission Rights – Do Auction Prices Reflect Option Values? Celine McInerney* Department of Accounting, Finance and Information Systems University College Cork Ireland

        Valuation of Interconnector Transmission Rights – Do Auction Prices Reflect Option Values? Celine McInerney* Department of Accounting, Finance and Information Systems University College Cork Ireland

        Add to Reading List

        Source URL: www.biee.org

        Language: English - Date: 2012-09-16 07:03:18
        6Presentation to the British Institute of Energy Economics, Oxford September 20th, 2012 Valuing interconnector transmission rights – do auction prices reflect option values?

        Presentation to the British Institute of Energy Economics, Oxford September 20th, 2012 Valuing interconnector transmission rights – do auction prices reflect option values?

        Add to Reading List

        Source URL: www.biee.org

        Language: English - Date: 2012-10-14 13:01:18
        7EirGrid Logo (Black and Gold) Positive ALL CAPS

        EirGrid Logo (Black and Gold) Positive ALL CAPS

        Add to Reading List

        Source URL: www.eirgrid.com

        Language: English - Date: 2015-03-26 15:03:47
        8Engineers Ireland Excellence Awards 2013 Entry for Engineering Project of the Year category EAST WEST INTERCONNECTOR 500 MW of power output

        Engineers Ireland Excellence Awards 2013 Entry for Engineering Project of the Year category EAST WEST INTERCONNECTOR 500 MW of power output

        Add to Reading List

        Source URL: www.eirgrid.com

        Language: English - Date: 2013-10-25 07:18:04
        9EirGrid Logo (Black and Gold) Positive ALL CAPS

        EirGrid Logo (Black and Gold) Positive ALL CAPS

        Add to Reading List

        Source URL: www.eirgrid.com

        Language: English - Date: 2015-03-26 15:00:28
        10EWIP (East West Interconnector Project) Operator Client Location Water Depth Year

        EWIP (East West Interconnector Project) Operator Client Location Water Depth Year

        Add to Reading List

        Source URL: www.emas.com

        Language: English - Date: 2013-12-10 14:15:35