<--- Back to Details
First PageDocument Content
Emission standards / Sustainable transport / Electric vehicle conversion / High-occupancy vehicle lane / Partial zero-emissions vehicle / Metropolitan Transit Authority of Harris County / Plug-in hybrid / Lane / Electric vehicle / Transport / Green vehicles / Land transport
Date: 2014-03-08 12:18:08
Emission standards
Sustainable transport
Electric vehicle conversion
High-occupancy vehicle lane
Partial zero-emissions vehicle
Metropolitan Transit Authority of Harris County
Plug-in hybrid
Lane
Electric vehicle
Transport
Green vehicles
Land transport

Agenda Item 4c METROPOLITAN T —W

Add to Reading List

Source URL: apps.mtc.ca.gov

Download Document from Source Website

File Size: 52,12 KB

Share Document on Facebook

Similar Documents

San Diego County Road Repair, Transit, Traffic Relief, Safety and Water Quality Measure Expenditure Plan Approved by the SANDAG Board of Directors on July 8, 2016 Complete Board Report available at sandag.org/boardmeetin

San Diego County Road Repair, Transit, Traffic Relief, Safety and Water Quality Measure Expenditure Plan Approved by the SANDAG Board of Directors on July 8, 2016 Complete Board Report available at sandag.org/boardmeetin

DocID: 1rs4U - View Document

Mobility Investment Priorities Corridor Project Checklist Instruction Notes:  Already Included – strategy is already integrated into corridor projects. *Use codes below for this column only: o BP: Best Practice is b

Mobility Investment Priorities Corridor Project Checklist Instruction Notes:  Already Included – strategy is already integrated into corridor projects. *Use codes below for this column only: o BP: Best Practice is b

DocID: 1rr7w - View Document

Mobility Investment Priorities Corridor Project Checklist Instruction Notes:  Already Included – strategy is already integrated into corridor projects. *Use codes below for this column only: o BP: Best Practice is b

Mobility Investment Priorities Corridor Project Checklist Instruction Notes:  Already Included – strategy is already integrated into corridor projects. *Use codes below for this column only: o BP: Best Practice is b

DocID: 1rqXz - View Document

Mobility Investment Priorities Project  Houston IH 45

Mobility Investment Priorities Project Houston IH 45

DocID: 1rqfR - View Document

APPENDIX A: LOS ANGELES URBAN AREA TRANSPORTATION PRIORITIES Facility/Route/ Rank Corridor/System Urban Area / and

APPENDIX A: LOS ANGELES URBAN AREA TRANSPORTATION PRIORITIES Facility/Route/ Rank Corridor/System Urban Area / and

DocID: 1rdAi - View Document