<--- Back to Details
First PageDocument Content
Types of roads / High-occupancy vehicle lane / Sustainable transport / Lane / Southern California freeways / Frontage road / Controlled-access highway / Traffic / Judge Harry Pregerson Interchange / Transport / Land transport / Road transport
Date: 2013-01-07 12:55:14
Types of roads
High-occupancy vehicle lane
Sustainable transport
Lane
Southern California freeways
Frontage road
Controlled-access highway
Traffic
Judge Harry Pregerson Interchange
Transport
Land transport
Road transport

Terms and Definitions for the Lane Closure System Web Report Status Canceled: Indicates closure was canceled Completed[removed]): Indicates planned lane closure has been completed and lane has been reopened

Add to Reading List

Source URL: lcswebreports.dot.ca.gov

Download Document from Source Website

File Size: 23,89 KB

Share Document on Facebook

Similar Documents

San Diego County Road Repair, Transit, Traffic Relief, Safety and Water Quality Measure Expenditure Plan Approved by the SANDAG Board of Directors on July 8, 2016 Complete Board Report available at sandag.org/boardmeetin

San Diego County Road Repair, Transit, Traffic Relief, Safety and Water Quality Measure Expenditure Plan Approved by the SANDAG Board of Directors on July 8, 2016 Complete Board Report available at sandag.org/boardmeetin

DocID: 1rs4U - View Document

Mobility Investment Priorities Corridor Project Checklist Instruction Notes:  Already Included – strategy is already integrated into corridor projects. *Use codes below for this column only: o BP: Best Practice is b

Mobility Investment Priorities Corridor Project Checklist Instruction Notes:  Already Included – strategy is already integrated into corridor projects. *Use codes below for this column only: o BP: Best Practice is b

DocID: 1rr7w - View Document

Mobility Investment Priorities Corridor Project Checklist Instruction Notes:  Already Included – strategy is already integrated into corridor projects. *Use codes below for this column only: o BP: Best Practice is b

Mobility Investment Priorities Corridor Project Checklist Instruction Notes:  Already Included – strategy is already integrated into corridor projects. *Use codes below for this column only: o BP: Best Practice is b

DocID: 1rqXz - View Document

Mobility Investment Priorities Project  Houston IH 45

Mobility Investment Priorities Project Houston IH 45

DocID: 1rqfR - View Document

APPENDIX A: LOS ANGELES URBAN AREA TRANSPORTATION PRIORITIES Facility/Route/ Rank Corridor/System Urban Area / and

APPENDIX A: LOS ANGELES URBAN AREA TRANSPORTATION PRIORITIES Facility/Route/ Rank Corridor/System Urban Area / and

DocID: 1rdAi - View Document