KEKB

Results: 19



#Item
1Peak Luminosity in a Day [×1034cm-2s-1] Improvements in the power of KEKB  1033

Peak Luminosity in a Day [×1034cm-2s-1] Improvements in the power of KEKB 1033

Add to Reading List

Source URL: www.kek.jp

Language: English - Date: 2014-03-27 21:12:03
    2名古屋大学理学研究科付属 タウ・レプトン物理研究センター 研究目的   「タウ・レプトン物理研究」を中心に、New Physics 探索を一層展開 KEKB-Belle

    名古屋大学理学研究科付属 タウ・レプトン物理研究センター 研究目的   「タウ・レプトン物理研究」を中心に、New Physics 探索を一層展開 KEKB-Belle

    Add to Reading List

    Source URL: www.hepl.phys.nagoya-u.ac.jp

    Language: Japanese - Date: 2008-09-21 06:51:43
      3STAN F O R D L I N E AR A C C ELER A TOR C ENTER Spring/Summer 1996, Vol. 26, No. 1 A PERIODICAL OF PARTICLE PHYSICS SPRING/SUMMER 1996

      STAN F O R D L I N E AR A C C ELER A TOR C ENTER Spring/Summer 1996, Vol. 26, No. 1 A PERIODICAL OF PARTICLE PHYSICS SPRING/SUMMER 1996

      Add to Reading List

      Source URL: www.slac.stanford.edu

      Language: English - Date: 1998-07-27 16:51:53
      43 PF-AR 3-1 Operation Summary The KEK B factory (KEKB), which shares the beam transport (BT) line with PF-AR, was shut down on June 30, 2010 and the upgrade toward the Super KEKB will continue until FY2014. At the same t

      3 PF-AR 3-1 Operation Summary The KEK B factory (KEKB), which shares the beam transport (BT) line with PF-AR, was shut down on June 30, 2010 and the upgrade toward the Super KEKB will continue until FY2014. At the same t

      Add to Reading List

      Source URL: pfwww.kek.jp

      Language: English - Date: 2012-02-26 20:01:45
      5CP Violation and Rare B Decays at Belle  DESY Seminar

      CP Violation and Rare B Decays at Belle DESY Seminar

      Add to Reading List

      Source URL: www.desy.de

      Language: English
      6Accelerators 3. PF-AR Upgrading Project system to the EPICS, which is successfully used in the KEKB control system. A beamline and an in-vac-

      Accelerators 3. PF-AR Upgrading Project system to the EPICS, which is successfully used in the KEKB control system. A beamline and an in-vac-

      Add to Reading List

      Source URL: pfwww.kek.jp

      Language: English - Date: 2010-01-05 10:14:42
      7March  6,  2008  Rev.  April  30,  2010  KEK’s Roadmap(5 Year Plan) <The  revised  description  on  Super­KEKB  is  added  to  the  original  text  of  the  KEK  roadmap as the amendme

      March  6,  2008  Rev.  April  30,  2010  KEK’s Roadmap(5 Year Plan) <The  revised  description  on  Super­KEKB  is  added  to  the  original  text  of  the  KEK  roadmap as the amendme

      Add to Reading List

      Source URL: www.kek.jp

      Language: English - Date: 2015-03-10 01:19:32
      8各位  KEKB 加速器 平成 23 年 10 月 27 日 放射線主任者

      各位 KEKB 加速器 平成 23 年 10 月 27 日 放射線主任者

      Add to Reading List

      Source URL: rcwww.kek.jp

      Language: Japanese - Date: 2012-07-09 09:48:49
        9各位 平成20 年12 月1日 放射線取扱主任者 伴 秀一  KEKB 日光実験棟における管理区域の拡大について

        各位 平成20 年12 月1日 放射線取扱主任者 伴 秀一 KEKB 日光実験棟における管理区域の拡大について

        Add to Reading List

        Source URL: rcwww.kek.jp

        Language: Japanese - Date: 2012-07-09 09:48:49
          10各位 平成 24 年 11 月 12 日 放射線取扱主任者 佐々木 慎一 (同代理者 波戸芳仁) 「KEKB-MR-D8D 加速空洞試験装置」の使用について

          各位 平成 24 年 11 月 12 日 放射線取扱主任者 佐々木 慎一 (同代理者 波戸芳仁) 「KEKB-MR-D8D 加速空洞試験装置」の使用について

          Add to Reading List

          Source URL: rcwww.kek.jp

          Language: Japanese - Date: 2012-11-22 03:22:26