Lock and Dam No. 4

Results: 2



#Item
1In 1937, Congress authorized the Minneapolis Upper Harbor Project which extended the Upper Mississippi River 9-Foot Navigation Project an additional 4.6 miles by constructing two locks to lift vessels over St. Anthony Fa

In 1937, Congress authorized the Minneapolis Upper Harbor Project which extended the Upper Mississippi River 9-Foot Navigation Project an additional 4.6 miles by constructing two locks to lift vessels over St. Anthony Fa

Add to Reading List

Source URL: www.mvp.usace.army.mil

Language: English - Date: 2013-01-03 17:53:55
2Lock & Dam No. 4 - Alma, Wis. Lock & Dam No. 4 P.O. Box 325 Alma, WI[removed]Phone: ([removed]

Lock & Dam No. 4 - Alma, Wis. Lock & Dam No. 4 P.O. Box 325 Alma, WI[removed]Phone: ([removed]

Add to Reading List

Source URL: www.mvp.usace.army.mil

Language: English - Date: 2013-01-03 17:53:53