Tarbela Dam

Results: 10



#Item
1Public Disclosure Copy  The World Bank Implementation Status & Results Report

Public Disclosure Copy The World Bank Implementation Status & Results Report

Add to Reading List

Source URL: www-wds.worldbank.org

Language: English
2CASE STUDY  GHAZI BROTHA HYDEL POWER PROJECT – A NATIONAL DEVELOPMENT PROJECT – FALLS PREY TO ORGANIZED FINANCIAL CRIME WROUGHT BY GOVT OFFICIALS IN COLLUSION WITH LAND MAFIA CAUSING A LOSS OF RS. 4 BILLION TO NATION

CASE STUDY GHAZI BROTHA HYDEL POWER PROJECT – A NATIONAL DEVELOPMENT PROJECT – FALLS PREY TO ORGANIZED FINANCIAL CRIME WROUGHT BY GOVT OFFICIALS IN COLLUSION WITH LAND MAFIA CAUSING A LOSS OF RS. 4 BILLION TO NATION

Add to Reading List

Source URL: www.nab.gov.pk

Language: English - Date: 2006-01-24 13:36:32
320th International Congress on Modelling and Simulation, Adelaide, Australia, 1–6 December 2013 www.mssanz.org.au/modsim2013 Challenges on modelling a large river basin with scarce data: A case study of the Indus upper

20th International Congress on Modelling and Simulation, Adelaide, Australia, 1–6 December 2013 www.mssanz.org.au/modsim2013 Challenges on modelling a large river basin with scarce data: A case study of the Indus upper

Add to Reading List

Source URL: www.mssanz.org.au

Language: English - Date: 2013-11-19 22:13:02
4Hydrol. Earth Syst. Sci., 14, 1669–1680, 2010 www.hydrol-earth-syst-sci.netdoi:hess © Author(sCC Attribution 3.0 License.  Hydrology and

Hydrol. Earth Syst. Sci., 14, 1669–1680, 2010 www.hydrol-earth-syst-sci.netdoi:hess © Author(sCC Attribution 3.0 License. Hydrology and

Add to Reading List

Source URL: www.hydrol-earth-syst-sci.net

Language: English - Date: 2014-12-04 02:41:06
5

PDF Document

Add to Reading List

Source URL: photos.state.gov

Language: English - Date: 2013-05-03 04:39:54
6

PDF Document

Add to Reading List

Source URL: photos.state.gov

Language: English - Date: 2013-09-05 02:29:44
7PROJECTS FOR USAID ASSISTANCE (ONGOING – NEW) FOR[removed]October 2013

PROJECTS FOR USAID ASSISTANCE (ONGOING – NEW) FOR[removed]October 2013

Add to Reading List

Source URL: www.wapda.gov.pk

Language: English - Date: 2013-10-24 00:32:06
8PAKISTAN WATER & POWER DEVELOPMENT AUTHORITY

PAKISTAN WATER & POWER DEVELOPMENT AUTHORITY

Add to Reading List

Source URL: www.wapda.gov.pk

Language: English - Date: 2011-04-05 03:15:30
9DIAMER BASHA DAM PROJECT Location Diamer Basha Dam (DBD) Project is proposed to be located on river Indus about

DIAMER BASHA DAM PROJECT Location Diamer Basha Dam (DBD) Project is proposed to be located on river Indus about

Add to Reading List

Source URL: www.wapda.gov.pk

Language: English - Date: 2009-12-16 13:35:02
10

PDF Document

Add to Reading List

Source URL: pecongress.org.pk

Language: English - Date: 2009-07-31 02:07:33